Civil
& Structural Works were undertaken and completed satisfactorily
through out the entire project area of 2,000 acres.
Piping for Hydro Carbons - MCC carried out the piping for
hydro carbons, which called for a high calibre of welding. 95,000
inch meter of piping ranging from 0.5" to 36", diameter
along with valves were welded, erected, tested and commissioned
under the supervision of EIL for the Motor Spirit/Kerosene/Fuel
Oil Tanks.
|