MCC
has undertaken several works at MRPL since their first assignment
of the masonry weir at Sarpadi.
Surface Drainage at the Upper Plateau - drains of various types
and sizes running to a total length of 10,500m were completed in a
very short time.
Two Site Offices were constructed, each measuring 1,500 sq.
m. in area on a turnkey basis.
|